Eliminate Rocking Floor Slabs
May 1, 2014

A rocking floor slab will become apparent at a loose floor joint, where the concrete slabs on either side of the joint move up and down independently of one another.
May 1, 2014

A rocking floor slab will become apparent at a loose floor joint, where the concrete slabs on either side of the joint move up and down independently of one another.
May 1, 2014
Time… A precious commodity we never seem to have enough off in this demanding modern world of instant information, answers, solutions, etc. etc. It almost feels as though there is never enough time to sit back and smell the proverbial roses in the workplace, never mind considering when you can allocate time to have essential maintenance carried out in a busy warehouse. That was certainly the initial impression we were given by a client for whom we have recently completed a concrete floor repair project.
May 1, 2014
We take great pride in our work and were delighted to receive some great feedback from one of the global market leaders in the logistics industry, DHL.
Video Transcript
Testimonial
I’m Paul Riley and I’m the regional facilities manager for DHL.
The biggest challenge at this site is the fact that it’s non stop, there are very few times in the working week when there is any down time to enable us to do any maintenance or repairs. I think the floor is one of those things that tends to get overlooked Read More
May 1, 2014
…floor joint repair works can be completed and opened to traffic for Materials Handling Equipment after 1 hour.
May 1, 2014
Floor n. 1 the bottom surface of a room, on which people walk and which supports the furniture. 2 the boards or other material of which this is made. 3 the lowest limit of prices, etc.
For a site visit or advice on the best solution, contact the experts.